Migrating from LearnDash
If you’re on LearnDash, the migrator brings your school across — curriculum, students, their progress, and groups — with two safety properties throughout: LearnDash data is only ever read, never changed, and every course imports atomically (a course that fails mid-import leaves no partial data behind).
Step 1 — the dry run
Open Gather Grove Courses → Import on a site where LearnDash is co-installed. The scanner shows exactly what a migration would create — courses, modules, lessons, and cohort candidates from your LearnDash groups — plus what’s deferred and any warnings. Nothing is written. You can download the full mapping plan as JSON for your records.
Step 2 — the import
Pick the courses to bring across and run it. Each LearnDash course imports as its own background job with a live progress bar and a final report, creating the matching Gather Grove course, modules, and lessons (with their content).
People, progress, and groups
Tick “Also import students, their completed-lesson progress, and groups” and each course’s LearnDash students are enrolled, with the lessons they had finished marked complete. Optionally, turn LearnDash groups into cohorts with a per-group toggle — it’s off by default; leave it off and those members are still enrolled, just without a cohort. The people import runs inside each course’s atomic boundary, so a failure rolls everything back together.
Safe to re-run
The import is idempotent: already-imported courses are skipped, and re-running the people step skips anyone already brought across. Interrupted halfway? Just run it again.
What doesn’t come across
Quizzes, certificates, and assignments are not migrated — the dry run lists them as deferred so there are no surprises. Two soft landings:
- Certificates — members whose imported progress amounts to a completed course are issued a Gather Grove certificate lazily, dated to when they actually finished.
- Quizzes — rebuild them in the quiz builder; imported lesson completions stand regardless.
After the import
LearnDash stays untouched and running — deactivate it on your own schedule, once you’ve confirmed the imported courses, enrollments, and progress look right. Imported group-cohorts have no drip schedule until you give them one in the cohort schedule editor; until then their members see everything unlocked, like any cohort without a configured schedule.
Applies to Gather Grove Courses v1.52.0. Last synced November 6, 2026.